The picture illustrates the process of electricity manufacture in a hydroelectric power station.
It is clear that the process involves various stages beginning with water flow in high-level reservoir and ending with electricity in power lines to the national grid.
Looking at first step of the process, river water stored in high-level reservoir which is blocked by a dam. Following this, an intake at the bottom of this dam which is opened in day to allows the flow of water to generate electricity and closed at night to the water flows out into the river below the dam during pumping.
In day, water flow to generating electricity by an operate generator in a power station then it is moved in power lines to national grid. By contrast, water from low-level reservoir will be pumped into high-level reservoir during the night to ready for day time activities.
- the plans below show a public park when it was first opened in 1920 and the same park today Summarise the information by selecting and reporting the main features and make comparisons where relevant 78
- The chart shows how frequently people in the USA ate fast food in restaurants between 2003 and 2013 56
- The charts below show the changes in ownership of electrical appliances and amount of time spent doing housework in households in one country between 1920 and 2019 Summarise the information by selecting and reporting the main features and make comparisons 73
- The charts below show the proportions of British students at one university in English who were able to speak other languages in addition to English in 200 and 2010
- The graph below shows the number of tourists visiting a particular Caribbean island between 2010 and 2017 Summarise the information by selecting and reporting the main features and make comparisons where relevant 73