the diagrams below shows the life cycle of the silkworm and stages in the production of silk cloth.
Summarise the information by selecting and reporting the main features, and make comparisons where relevant
The given diagram analyzes how silkworm is made and how silk clothes are prepared.
Generally, life cycle of the silkworm is 5-sectioned and takes 2-3 months and production of silk cloth has 5 specific parts.
In the first stage, a moth puts its eggs onto a leaf and within 10 days silkworm and larvas emerge from eggs. As they feed themselves with mulberry leaf, after 4-6 weeks, they make a couple of silk threads. Larvas usually leave their cocoons within 3-8 days.
The good selected cocoons are brought up and put into water to be boiled over high temperatures in a big vessel. After unwinding, it becomes 3-9 hundred meters thread. This thread can be twisted and weaved. In this scene, finally, after waiting for some time , they are ready to be coloured.
Overall, cocoon is made within 6-8 weeks periodically, then, it is selected and due to it, silk clothes are prepared within 6 sections.
- The flowchart illustrates the production of coloured plastic paper clips in a small factory Write a report for a university tutor describing the process 89
- Many parents think it is necessary to teach children about money. Do you agree or disagree? Include your own reasons and share your experience and knowledge. by friend 48
- The pie charts below show units of electricity production by fuel source in Australia and France in 1980 and 2000. Summarise the information by selecting and reporting the main features ,and make comparisons where relevant. 67
- some people think saving money is good ,but others think that spending money is a better way to enjoy life.Discuss the both views and give your own opinion. 85
- The graph bellow shows the consumption of fish and some different kinds of meat in a European country between 1979 and 2004 Summarize the information by selecting and reporting the main features, and make comparisons where relevant 70
and production of silk cloth has 5 specific parts.
and the production of silk cloth has 5 specific parts.
Attribute Value Ideal
Score: 7.0 out of 9
Category: Good Excellent
No. of Grammatical Errors: 1 2
No. of Spelling Errors: 0 2
No. of Sentences: 10 10
No. of Words: 155 200
No. of Characters: 712 1000
No. of Different Words: 106 100
Fourth Root of Number of Words: 3.528 4.0
Average Word Length: 4.594 4.6
Word Length SD: 2.288 2.4
No. of Words greater than 5 chars: 48 60
No. of Words greater than 6 chars: 33 50
No. of Words greater than 7 chars: 19 40
No. of Words greater than 8 chars: 7 20
Use of Passive Voice (%): 0 0
Avg. Sentence Length: 15.5 21.0
Sentence Length SD: 5.801 7.5
Use of Discourse Markers (%): 0.3 0.12
Sentence-Text Coherence: 0.358 0.35
Sentence-Para Coherence: 0.685 0.50
Sentence-Sentence Coherence: 0.044 0.07
Number of Paragraphs: 5 4