The diagram illustrates the process of generating electricity by using geothermal energy.
Overall, there are five main steps in this process, beginning with cold water and ending with making electricity in the power plant.
In the first stage of the process, the cold water pumped down 4,5 km underground into an injection well. In the next step, the water goes through an area called the geothermal zone, which contains a lot of hot rocks used to increase the temperature of the water.
After the next step, the hot water is transported to the condenser where hot water is pumped up a condenser, ready for the next stage. In the condenser, the hot water transforms into steam and use to power steam. Then, the production of electricity by a generator make powered by a turbine and produces electricity.
- This pictures below show how tomato ketchup is made Summarise the information by selecting and reporting the main features
- The graph below shows the consumption of 3 spreads from 1981 to 2007 87
- Some people think that good health is very important to every person so medical service should not be run by profit making companies 82
- The table gives information about five types of vehicles registered in Australia in 2010 2012 and 2014
- Studying with a group of students in a classroom is more beneficial than learning online at home To what extent do you agree or disagree 61