The plans show changes to the layout of a theatre between 2010 and 2012
The diagrams illustrate the changing to the design of a drama from 2010 to 2012.
Overall, it is clear that the theatre was enlarged in 2012. The auditorium of the diagrams remained unchanged.
First, the plans were added several place to the left such as dressing room, showers and the storage. In 2010, the storage was located to the right of the maps and then which was changed with admin office.
Second, the auditorium was unchanged since 2010 until now. In addition, the stage was located on top of the auditorium from 2010 to 2012, which only was enlarged in 2012. The dressing room was transformed by a coordination and the area of admin office and ticket office was changed with restaurant area. Moreover, a coffee shop was placed in corner to the right of the diagrams also was changed into a ticket office. Finally, the main door still remained to the under of the plans.
- The graph shows the amount of fossil fuel energy generated in Europe between 1981 and 2001 10
- People nowadays tend to take their family to another country when they work abroad Do you advantages of this outweigh the disadvantages 56
- The diagram shows the small scale production of smoked fish
- The maps below show the changes to an art gallery floor plan in 2005 and the present day
- In some countries more and more adults are continuing to live with their parents even after they have competed education and found jobs Do the advantages outweigh the disadvantages 67